欧美在线免费观看一区二区三区-中文字幕第一页第二页第三-精品中文字幕高清久久久久三级-一区二区三区不卡视频在线观看

Language:CHINESESENGLISH

Home > News > Cangzhou province's first affordable housing project construction steel
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.bokepower.com

Cangzhou province's first affordable housing project construction steel

Time:[2014-11-5]  Hits:4865

      Recently, the municipal government and Hebei Cangzhou Great Yuan jointly building the province's first steel structure construction of affordable housing projects started. The project covers an area of ​​66.87 acres and plans to build 8, 1588 residential units and commercial and service facilities, with a total construction area of ​​136,000 square meters, with a total investment of 472 million yuan.
     The project uses the steel skeleton of lightweight composite materials with a variety of wall assembly process, compared with the traditional houses, concrete dosage can be reduced by 50%, the overall weight of the building fell about 25 percent, the construction process water and electricity will also be cut back. Because steel has good ductility, can make structural damage during strong earthquakes produce deformed not only collapse.
     According to reports, the steel components of the project on the factory floor for processing and transported to the scene to conduct an overall assembly by welding or bolts, saving a template for supporting timber and steel dominated the scene in assembly operations, reduced noise and dust. The project is also equipped with solar collectors each residential unit, to achieve energy saving effect.
Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號