欧美在线免费观看一区二区三区-中文字幕第一页第二页第三-精品中文字幕高清久久久久三级-一区二区三区不卡视频在线观看

Language:CHINESESENGLISH

Home > News > Guangzhou Steel News: Hengqin induction service area welcomed the first steel hanging
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.bokepower.com

Guangzhou Steel News: Hengqin induction service area welcomed the first steel hanging

Time:[2015-5-27]  Hits:5053

Guangzhou Steel News: Hengqin induction service area welcomed the first steel hanging

Guangzhou Steel reported: Services District, Zhuhai Hengqin induction welcomed the first steel hanging. Recently, the commitment of a Steel Co., Ltd. Steel production, installation end successfully Hengqin induction service area projects Section basement steel columns lifting.


Guangdong Hengqin Hengqin Area FTA is the only land bridge connecting Hong Kong and Macao regions, the service area project is located in Hong Kong and Macao are summarized Parkway and Island Road Interchange, west of Road Qin, Qin Zheng road south, the north has been built adjacent to Hong Kong and Macao road, adjacent to the east side of the piano Lang Road, location. The underground 2 floors, on the ground 19 floors, the building height of 99.9 meters, with a total construction area of ​​about 230,000 square meters, with steel concrete frame and steel plate shear wall structural system of concrete core tube, is housed in commercial, working and hotels one of the induction of high-rise buildings.

According to the Guangzhou Steel it is understood that the lifting of the steel member 2 meters long, and weighs 2.5 tons. To ensure that the root of lifting the first steel member can safely and accurately hoisting, a steel project department actively Hengqin Poly harmony of all resources, two months ahead of the end of the detailed design and construction safety special programming, to develop a scientific and rational construction program, close orderly end component processing, on-site embedded, technical tests, and so on. The project marks the opening of the formal lifting into the main construction period, also started together in the construction of steel Zhuhai Hengqin FTA crucial first shot.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號