欧美在线免费观看一区二区三区-中文字幕第一页第二页第三-精品中文字幕高清久久久久三级-一区二区三区不卡视频在线观看

Language:CHINESESENGLISH

Home > News > Foshan Steel budget should be done before some of the knowledge necessary
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.bokepower.com

Foshan Steel budget should be done before some of the knowledge necessary

Time:[2016-5-28]  Hits:4532

Foshan Steel budget should do before some of the knowledge necessary

(1) To know Foshan steel construction technology, specifically how each process is picking, how cutting, how construction, so you can make the calculation does not reveal the amount of the project later, you can also know where some more losses;

(2) To study for construction of steel structures such as Foshan Feet Iron is how to arrange, what are the requirements, the number is the number; non-destructive testing, H-shaped steel butt weld NDT needs to know which is the H-beam flange, which is H beam web, wing needs a weld 100% super-probe, two webs welds required to obtain 20% exploration and so on;

(3) but also understand the scale, metal fabrication and installation process know what the fixed structure fixed subheadings of a specific project which sets the amount of the subheadings in order to calculate the papers clearly marked on different sub-purpose engineering, to facilitate future viewing.

(4) read the quota, quota know what subheadings calculation rules to learn in engineering, according to the fixed sub-headings have learned in the learning calculation rules, learn the calculation rules for each subdirectory in the calculation of what it should be noted , such as the unit of measurement is m or m2, such as super-steel probe to the weld length "m" as a unit of measurement, surface inspection of sheet metal plate to plate area "m2" as the unit of measurement; in particular, to remember what is a joint platform because the joint platform subheading relatively high cost, more appropriate sets of this joint platform is internet platform more than two devices composed of interconnected easy access used when calculating the amount of the project including the platform ladders, railings, handrails weight. For example, when we compute platform framework, in addition to columns and beams, all of the remaining quantities can be regarded as a joint platform; also carefully look at steel construction technical measures, such as how the framework is fragmented or segmented lifting , what reinforcement, so that the calculated quantities of reinforcement steel erection, can also calculate the required specifications and the number of lifting lugs when lifting out the measures, what kind of platform depends on technical measures in the laying of prefabricated steel structures, much like when you calculate these quantities incidentally also calculated.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)